Welcome to the Street, Sanitary Sewer, Water Main & Storm Sewer Improvements project entitled City Project No. 5948 in the City of Fergus Falls! The purpose of this blog is to keep residents informed of the construction activity taking place in your neighborhood, and provide contact information for any questions or concerns you may have.
Project Area
The City Project No. 5948 project is comprised of the following areas around Fergus Falls:
-
Arlington Street – Vernon Avenue to Alcott Avenue
-
Vasa Avenue – Union Avenue to Mill Street & Sheridan Street to Arlington Street
-
Alcott Avenue – Union Avenue to Mill Street
-
Bancroft Avenue – Union Avenue to Mill Street
-
Channing Avenue – Union Avenue to Mill Street
-
Court Street – Vasa Avenue to Channing Avenue
- Mill Street – Vasa Avenue to Channing Street
A project area map is also provided on this blog for residents to better identify the project area.
Project Team
The City of Fergus Falls has awarded a construction contract to Mark & Brenda Construction dba Delzer Construction of Fergus Falls to perform the project improvements. Moore Engineering, Inc. will be managing engineering duties and working with the City and Contractor on this project.
•First Point of Contact•
Resident Project Representative – Lyle Hanson: 218.849.1055
•Delzer Construction•
Nathan Lukken: 218.731.5850
On Site Superintendent – Paul Sonmor: 218.770.0918
•Moore Engineering, Inc.•
Project Manager – Tyson Hajicek: 218.998.4041
•City of Fergus Falls•
Public Works Department: 218.332.5435
Anne Martens / Dan Edwards
The above contacts are listed for residents of the project area in order to provide a contact person to call with project specific questions or problems. Resident project representative Lyle Hanson is the best person to initially contact with questions as he will be in the field for the duration of the project. Lyle can typically meet with you on site to answer questions, or attempt to resolve any problems that may be occurring.
Project Timing
The contractor is scheduled to begin work the week of June 4th, 2012. Initial construction operations will include the installation of traffic control devices, delivery of materials to the site, and the reclaiming of a portion of the roadways within the project area.
The initial project area where work will begin are the areas described as follows: Arlington Street – Vernon Avenue to Alcott Avenue, Vasa Avenue – Sheridan Street to Arlington Street, Mill Street – Vasa Avenue to Channing Street, and Channing Avenue – Union Avenue to Mill Street. The project location map also denotes these areas.
A reclaiming machine will be brought in to grind up the existing roadway surfaces. This ground up material will be re-compacted and left in place until excavation operations begin, which is scheduled to start the week of June 11th, 2012. The roadways will be safe to travel with a vehicle or pedestrian traffic during this time. Although these streets are safe for travel we ask that residents do not park on the streets in these areas if at all possible and utilize other routes around the project area. No parking signs will be installed over the weekend prior to the start of construction notifying residents of areas where parking will be restricted. We ask that no parking in these areas is followed as vehicles will impede the contractor’s ability to perform work in these areas. As construction continues to various areas of the project these signs will be utilized in advance to forewarn residents.
What to Expect
The improvements will ultimately consist of street, sanitary sewer, water main and storm sewer improvements throughout the project area.
Pursuant to City policy existing water services encountered that are constructed of lead, steel, or iron pipe, located within the right-of-way, must be replaced as a part of this project. In those instances, the water service will be replaced in conjunction with the water main replacement and a new water service will be installed to the right-of-way/property line where it will be reconnected to the existing water service. If City records indicate that individual water services are something other than copper pipe residents should have received a letter regarding this in October, 2011. Where the water main is being replaced temporary water service will need to be extended to the homes which are impacted. There may be times when water service will be unavailable to homes, but construction activity will be coordinated so that this disruption is temporary. The temporary water service will resemble a hose that is strung across the boulevard and over the ground where it is connected to the houses. The contractor will ramp the hoses where they cross individual driveways and streets so they are safe to drive over by vehicles. Additionally, when the water service is reconnected after testing and disinfection of the main line, residents are urged to run the water within the house or an outside faucet for 15-20 minutes to flush out the lines of any residual chlorine.
Sanitary sewer services which are located within the right-of-way may be replaced (owner option) as a part of this project. Please consider replacing your sewer service if you are having problems with your sanitary sewer or want to avoid a possible unplanned replacement in the future. Unless an individual homeowner elects to have the sanitary sewer service replaced, the existing service will be reconnected to the new main.
During the initial week of construction, Lyle Hanson (resident project representative) will be on site attempting to contact individual homeowners door to door and will have additional information related to the sewer and water service replacement options. In the event that he is unable to catch homeowners this information will be left in the door. Any residents wishing to participate in the service replacement can also contact anyone on the contact list to obtain further information or schedule a time to meet.
All work on this project will be performed by open trench methods, which means that the contractor will be digging in all areas of the project. The contractor will need to periodically close portions or all of the streets during their construction operations. Temporary detours will be implemented to give the residents availability to reach their homes. At some point(s) during construction not all residents will be able to reach their homes with their vehicles, parking areas will be designated and this inconvenience will be temporary.
Additional work which will be performed throughout the project area will be the replacement/addition of storm sewer mains, replacement of areas of curb and gutter, sidewalk improvements at intersections, and street improvements. All streets are scheduled to have the underground work completed and have the base course of pavement completed by October 19, 2012.
General Information
We anticipate the project to go smoothly and will do everything possible to keep the residents informed and limit any project inconveniences to as little as possible. If there are any residents which have any medical problems or need to have 24-hour access to their homes due to medical reasons, please contact Tyson Hajicek at 218.998.4041 so that the contractor can be made aware of the situation and construction operations can be coordinated accordingly. Any residents who are planning gatherings or events out of their homes this summer are also encouraged to contact Tyson ahead of time so that arrangements can be made to accommodate these functions.
Garbage containers will be marked specifically to the individual residences. Residents can bring garbage containers to the curb normally throughout construction, if construction activity prevents the garbage truck from getting to your house the contractor will coordinate the containers in these areas to ensure they are dumped and returned back to the curb for residents to collect.
Safety is a major concern on the job-site. The contractor will take precautions to help with safety at the site. Parents, please be extra careful and ensure your children are not climbing or playing on or around construction equipment. If you do notice safety issues, please contact anyone on the project team so it can be quickly resolved.
Construction Updates
All future construction updates will be available online. A link to this blog can also be found at mooreengineeringinc.com or the City of Fergus Falls website. Weekly updates will provide residents with construction progress, estimated timelines and what to expect as the project advances. Print outs will be made available at City Hall for residents without internet access.